Grace period for label changes

Viewing 9 posts - 1 through 9 (of 9 total)

Grace period for label changes

We are tarnishing an ongoing study to the new CTR. Is there a grace period to ship CTD labeled supply from the depot to the site after CTR approval? The current booklet label has the EUDRA number printed on it. I’ve been told that I have to stop shipping that supply from a depot to a site the day we receive CTR approval and can only ship IP that meets CTR label requirements (which is to not include the EUDRA #). Thanks for the support?

Viewing 9 posts - 1 through 9 (of 9 total)

You must be logged in to reply to this topic.